- Equip a semi-buried storage tank holding 2000 m³
- Supply a pressure boosting station with pumping equipment to provide a flow rate of 400 m³/h and a total head of 40 m
- Set up a gas chlorination system
- Install water meter chamber and stabilizer
- Install connecting chamber equipment
- Lay underground pipes