Reference cases and projects

REHABILITATION OF THE STATION OF LOUVERIE

CUSTOMER: SAINT DENIS DE GASTINES' TOWN
LOCATION: SAINT DENIS DE GASTINES 53500
Missions:

Drilling F1 and F2 :

 

  • Total flow rate for each drilling : 15.6 m3/h
  • Head TdH : 21.6 m

 

For each drilling : 

  • 2 drilling pumps GRUNDFOS, type SP14-6, 1.5kW, with cooling-jacket
  • 2 flow columns in stainless steel 316L DN100, length 7m
  • 2 check valves DN100, with adapters

 

Instrumentation :

  • 1 Electromagnetic flowmeter on the discharge manifold common to the 2 boreholes
  • 1 piezometric level sensor in each borehole 

 

Station :

 

  • Total flow : 30 m3/h
  • Head TdH : 29 m

 

  • Acceleration pumpsets :
  • Number : 2 (with 1 existing backup pump)
  • Brand : GRUNDFOS, type CR 32-2
  • Operating point : 30m3/h at 29m
  • Motor power : 4 kW

 

  • Electro pump washing filter unit:
  • Number : 1
  • Brand: GRUNDFOS, type 32-2
  • Operating point : 30m3/h at 30 m
  • Engine power : 4 kW

 

Hydraulic piping in stainless steel 316L DN80 to DN100, including valves:
 

 

Control tank:
- 1 500 liter tank 

 

Instrumentation
- 1 existing electromagnetic flowmeter
- 1 pressure sensor Endress and Hauser Cerabar
- 1 CIR chloride analyzer type Ami Trides
- 1 Turbiwell Ami Turbidity Analyzer 

 

Chlorination
- 1 gas chlorination unit with self-reversal CIR, including external cabinet for 2 bottles

 

Electricity :
- 1 power / control panel 63A
- The reuse and adaptation of the existing Sofrel S550 remote transmitter (adding inputs / outputs)
- 2 Schneider ATV312 speed drives for the intake pumps
- 1 Schneider ATS22 electronic starter for the wash pump
- Tertiary equipment 

1 drainage station
 
Rehabilitation of the station (removal of tiles, concrete screed on the ground, replacement of doors and windows, creation of an unloading platform, painting of the walls).
 
Gate and fences around each of the boreholes (2x40ml) and at the entrance of the station (45ml). 

 

Key data:

Drilling:

  • Total flow rate for each drilling : 15.6 m3/h
  • Head TdH : 21.6 m

 

Station:

  • Total flow : 30 m3/h
  • Head TdH : 29 m


Website created by Studio Version 2 - Legal notices - Site plan - Copyright © Feljas & Masson - All rights reserved