Up date of the Water Treatment Plant
- Pumping station equipped with 2 pumps (1 + 1 in stand by) of 48 m3/h sand tranpping and flotation and 1 pump identical to the old ones towards the storm reservoir
- Rehabilitation of the existing sedimentation tank into a storm reservoir
- Cleaner - sand tranpping and flotation (Æ 2,50 m)
- Remplacement of existing air turbine
- Physical-chemical phosphate removal
- Circular getter, scraping surface Æ 1,80 m)
- Scraping Sedimentation tank (Æ 11,80 m)
- Dewatering sludgecentrifugeuse (Andritz, D3L)
- Electricity, automation system