Reference cases and projects

LANNION TREGOR COMMUNITY – PLESTIN LES GREVES WATER TREATMENT PLANT 5500 PE

CUSTOMER: NNION TREGOR COMMUNITY
LOCATION: PLESTIN LES GREVES (22)
Missions:

Extension of the Plestin-Les-Grèves water treatment plant

  • 1 pumping station equipped with 3 pumps of capacity 100 m3/h each (2 + 1 backup)
  • Renovation of the existing grease & gravel remover
  • Improvement of the existing aerated lagoon: safety work, weir, etc.
  • Reuse of the existing clarifier unit in aeration channel (2 FUCHS brand aerators, weir, etc.)
  • Scraper deaerator structure (Æ 3.20 m)
  • Radial scraper-clarifier settling tank (Æ 22.30 m) with ancillary works (sludge well, sludge and floating material extraction well)
  • Renovation of the existing sludge silo
  • Centrifugal sludge treatment (Andritz D3LL)
  • Renovation of the control room and construction of a new adjacent laboratory
  •  Electric cabinet, automation system, CCTV surveillance system, supervision
Key data:

Water stream capacity: 4500 PE

Sludge stream capacity: 5500 PE

Flowrate: 1100 m3/h – 190 m3/h

Value of contract: €1 369 000 excl. VAT including FM's share of €783 025 excl. VAT