LORIENT BUILT-UP AREA – PONT SCORFF WATER TREATMENT PLANT 3600 TO 5400 PE

CUSTOMER: LORIENT BUILT-UP AREA
LOCATION: PONT SCORFF (56)
Missions:

Extension and renovation of the Pont Scorff water treatment plant from 3600 PE to 5400 PE

  • 1 pumping station equipped with 3 pumps of capacity 90 m3/h each (2 + 1 backup)
  • Construction of an overflow basin (120 m3) with restitution by motor-driven guillotine gate valve
  • Installation of a rotating sieve with internal supply (SPF brand)
  • Reuse of the biological basin: 1 new turbine (Europelec brand) in addition to the 2 existing turbines and noise insulation housings for the 3 turbines, 1 stirrer
  • Instrumentation (sludge blanket probe, sampler)
  • Extension of the sludge treatment system with the creation of a new liquid sludge storage silo (1200 m3)
  • Deodorisation of structures: pumping station, buffer tank and sludge silo
Key data:

Capacity: 5,400 PE

Flowrate: 180 m3/h

Value of contract: €745 850 excl. VAT including FM's share of €451 500 excl. VAT