Extension and renovation of the Pont Scorff water treatment plant from 3600 PE to 5400 PE
- 1 pumping station equipped with 3 pumps of capacity 90 m3/h each (2 + 1 backup)
- Construction of an overflow basin (120 m3) with restitution by motor-driven guillotine gate valve
- Installation of a rotating sieve with internal supply (SPF brand)
- Reuse of the biological basin: 1 new turbine (Europelec brand) in addition to the 2 existing turbines and noise insulation housings for the 3 turbines, 1 stirrer
- Instrumentation (sludge blanket probe, sampler)
- Extension of the sludge treatment system with the creation of a new liquid sludge storage silo (1200 m3)
- Deodorisation of structures: pumping station, buffer tank and sludge silo