Reconstruction of the water treatment plant
- Reuse of the existing aerated lagoon V=200 m3
- Construction of a new aerated lagoon V=740m3 driven by turbine (2x15 kW)
- 847 m3 aerated lagoon driven by turbines
- Physical & chemical de-phosphatation
- Treatment of residue from septic tanks
- 150 m² scraper-clarifier settling tank
- Centrifugal sludge treatment and storage in skips and silos
- Control room and sludge treatment room: renovation of sludge storage silo
- Electric cabinet, automation system, CCTV surveillance system