Reference cases and projects

SIAEP DE CLOHARS FOUESNANT - REINFORCEMENT AND MODERNISATION OF THE LANVERON TREATMENT PLANT AT ST EVARZEC

CUSTOMER: SIAEP DE CLOHARS FOUESNANT
LOCATION: ST EVARZEC (29)
Missions:

Reinforcement and modernisation of the Lanvéron potable water treatment plant at Saint-Evarzec

  • 3 borewell pumps installed, flowrate 50 m3/h,
  •  Raw water tank: volume 100 m3,
  •  Degassing ramp at the raw water tank inlet,
  •  Filtration on terrestrial limestone: 2 open filters, flowrate: 50 m3/h
  •  Open filter supply station: 2 x 50 m3/h pumps
  •  Chlorine regulation at outlet of the open filters
  •  750 m3 treated water tank
  •  Reinjection of the treated water to the existing 50 m3/h water tower and surge control tank
  •  Soda regulation at treated water discharge
  •  50 m3 washing water tank
  •  Washing station: 2 x 100 m3/h pumps and 1 x 240 Nm3/h air pressure booster
  •  Electricity, automation system, CCTV surveillance, supervision on HMI
Key data:
Capacity: 50 m3/h. Value of contract: €681 475 excl. VAT including FM's share of €297 475 excl. VAT


Website created by Studio Version 2 - Legal notices - Site plan - Copyright © Feljas & Masson - All rights reserved