Reinforcement and modernisation of the Lanvéron potable water treatment plant at Saint-Evarzec
- 3 borewell pumps installed, flowrate 50 m3/h,
- Raw water tank: volume 100 m3,
- Degassing ramp at the raw water tank inlet,
- Filtration on terrestrial limestone: 2 open filters, flowrate: 50 m3/h
- Open filter supply station: 2 x 50 m3/h pumps
- Chlorine regulation at outlet of the open filters
- 750 m3 treated water tank
- Reinjection of the treated water to the existing 50 m3/h water tower and surge control tank
- Soda regulation at treated water discharge
- 50 m3 washing water tank
- Washing station: 2 x 100 m3/h pumps and 1 x 240 Nm3/h air pressure booster
- Electricity, automation system, CCTV surveillance, supervision on HMI